Qingdao Yimei Environment Project Co., Ltd.
Products
Contact Us
  • Contact Person : Ms. zheng Jennifer
  • Company Name : Qingdao Yimei Environment Project Co., Ltd.
  • Tel : 86-532-88180456
  • Fax : 86-532-88183375
  • Address : Shandong,Qingdao,Chang an Road, Jiaonan Qingdao
  • Country/Region : China
  • Zip : 266400

Underground Sewage Treatment Plants

Underground Sewage Treatment Plants
Product Detailed
Related Categories:Waste Management
It adopt the world advanced biological treatment process,sets removing BOD5.COD,NH3-N in one which's widely used in domestic

Brief Introduction :

The underground sewage treatment equipment adopt the world advanced biological treatment process, sets removing BOD5,COD,NH3 in one, Which is the most efficiency sewage treatment equipment at present. Which is widely used in treating domestic sewage of advanced hotel, Villa district and Residential district, replace the Septic tanks which has low Removal Rate and can 't reach the country Comprehensive Sewage Discharge Standard after actual apply indicate the serial YMDM AO sewage treatment equipment is a treatment effect ideal and manage convenient equipment.

Attractive Characteristics:

 1, laying inground,above the surface can be used as green or other land, no housing and heating, insulation.

 2, two biological contact oxidation process are the use of plug to flow bio contact oxidation, the treatment is better than completely mixed or two series completely mixed biological contact oxidation pool. And small size than the activated sludge tank, the water quality of adaptability, resistance to shock loading performance, effluent quality and stability, does not produce sludge bulking. Pool using the new flexible three dimensional packing, large surface area, microbial and easy to hang film, stripping, in the same organic load conditions, high removal rate of organic matter, oxygen in the air can increase the solubility in water.

3, biochemical use of biological contact oxidation pool, its relatively low volume loading of filler, microbial oxidation stage in their broken, less sludge production, only three months (90 days) above a row of mud (using suction truck or dehydration cake transport out).

4, the integration of deodorizing sewage treatment facilities in addition to the conventional way of high altitude exhaust, come with a soil deodorization measures.

5, the entire processing system is equipped with fully automatic equipment control systems and electrical equipment failure alarm system, safe and reliable operation, usually does not require expert management generally, only timely maintenance and repair of equipment.

Process and Technical Parameter  refer to the picture attached

( function(){ var aBigImageSrc = [ 'http://i00.i.aliimg.com/photo/v0/696042406_1/Underground_Sewage_Treatment_Plants.jpg' , 'http://i00.i.aliimg.com/photo/v0/696042406_2/Underground_Sewage_Treatment_Plants.jpg' , 'http://i00.i.aliimg.com/photo/v0/696042406_3/Underground_Sewage_Treatment_Plants.jpg' ]; var oProductShow = new AE.run.minisite.productShow(); oProductShow.init( { 'aImgSrc': aBigImageSrc } ); } )(); Underground Sewage Treatment Plants



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.